Drilldown: CapGrads
Use the filters below to narrow your results.
Don't rush your Senior year! I was so excited for Senior year to start so that I could be done with high school. When my last year ended abruptly due to Covid-19 I realized that I wasn't ready for it to be over. I yearned to walk down the halls one last time.
So, enjoy your last year in high schoo (1) ·
HAVE A BACKUP PLAN!! And a backup plan for that. But remember there is a such thing as too safe. Let loose but be prepared for failures and lessons. (1) ·
Turn in your artifacts! They seem stupid but you will forget all of the cool stuff you have done for your project. (1)
I have been a Starbucks Partner for over two years, of that I was a barista for 11 months, a trainer for 9 and a Supervisor for the last 6. It took two separate interviews with two different store managers to finally get the job, but as soon as I did I fell in love with the job, my store, and cowork (1) ·
I've always loved working with kids! I've been volunteering at Mark Twain Elementary for years with my previous teachers and with my youth group. I decided to do my capstone on early childhood learning. I volunteered weekly with Joyce Hembree, a Pre-K teacher at Mark Twain. I assisted her in teachin (1) ·
My original capstone project was to create an irrigation system for the plants in the Commons on top of the bookshelf. I designed the dropper, the base, end caps, the hose splitter, and connectors. I have my irrigation system put together on a metal shelf that I bought to finish the project. My irri (1)
I decided to volunteer with elementary school kids at Mark Twain Elementary and later on at the Common Good. (1) ·
My capstone project was an indoor irrigation system for the plants on top of the book shelves in the Commons. The irrigation system was to be automated and would only need for the reservoir to be filled every so often; everything else would be taken care of by the system. The system would run off of (1) ·
My initial idea was to document the process of becoming a shift supervisor at Starbucks, but because my store was in need of a supervisor and everyone I worked with was waiting on me to turn 18 so I could promote anyway, I ended up skipping a lot of the process. Since COVID -19 I am beyond proud to (1)
For the most part my project went as planned. I went weekly and volunteered at Mark Twain. I also received a job offer after volunteering at the Common Good. The end of my project did not go as planned. I was going to take videos of some of the teachers and students asking about their experience thr (1) ·
I have been super excited about presenting everything I have learned working at Starbucks and promoting within the company since we heard about the capstone project at the end of our sophomore year! As soon as we heard about it I knew I was going to present my promotions at Starbucks and everything (1) ·
It felt like I had to completely change my project. I had to downsize everything and almost start over. I lost the capability to set up the system how I had originally designed it. In order for the new system to work I had to completely change the way that the water was going to flow to the plants. (1)
As I put this project together (gather photos and look through artifacts) I am realizing more and more that my coworkers are the best part of my job. From starting as a barista and working alongside most of them to learning from my supervisors (and friends) to becoming one of them. All of my barista (1) ·
Early childhood education is often overlooked as an easy babysitting job when in reality it's far from it. Early educators have the responsibility to prepare their class to be successful learners in upcoming years. It's crucial to have achieved such skills as: knowing the abc's, counting, reading, a (1) ·
I did the best that I could with the time that I had. I made a system that worked and that watered my plants. It is not nearly as fancy or sophisticated as I had originally planned on it being, but I still made it happen and I am proud of it. It was a struggle and a half to completely spin and start (1)
Showing below up to 3 results in range #1 to #3.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)


